Road Works Ahead in the Wimbledon Area
Traffic disruption and diversions may occur
Below is a list of forthcoming roadworks in the SW19 area which are likely to cause some local delays:
A238 Kingston Road, Raynes Park, London, Merton |
24 March — 05 April |
Delays likely Traffic control (multi-way signals) |
Works location: A238 |
Works description: To Excavate And Repair Leak In C/W And F/W |
Responsibility for works: Thames Water |
Current status: Planned work about to start |
A238 Coombe Lane, Raynes Park, London, Merton |
28 March — 29 March |
Delays likely Traffic control (multi-way signals) |
Works location: A238 |
Works description: Cw Anti Skid Approx 329sqm |
Responsibility for works: Merton London Borough Council |
Current status: Planned work about to start |
|
|
A238 Coombe Lane, Raynes Park, London, Merton |
29 March — 29 March |
Delays likely Traffic control (two-way signals) |
Works location: A238 |
Works description: Sahara Surveying For Leak Detection. No Excavation, Chamber Opening Only. Works To Take Place On 29/03/2016 Between 10:00 And 15:00 |
Responsibility for works: Thames Water |
Current status: Planned work about to start |
|
|
B235 St George's Road, London, Merton |
29 March — 31 March |
Delays likely Traffic control (priority working) |
Works location: B235 |
Works description: Lay 18m Of Duct In The Carriageway And 3m In The Footway |
Responsibility for works: Virgin Media |
Current status: Planned work about to start |
|
March 28, 2016 |