Where to watch out for road delays in and around SW19
Current roadworks in the Wimbledon area include:
Lingfield Road, Wimbledon
08 December — 11 December
Severe delays likely - Road closure
Works location: Outside and opposite 42, SW19 4PZ
Works description : New water connection 1x32mm MDPE MTRD supply off of 4" CI main excavating 2m footway and 4m carriageway
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU309000809425980045-001
Ridgway, Wimbledon
07 December — 13 December
Severe delays likely - Road closure
Works location: Outside 117
Works description : Excavation on 9’’ main install temp works/ slip trench in C/W to lay meter ducting & water supply. Excavation in F/W full width to install DM pillar & water supply Atplas unit, install new meter construct chamber will need to be concrete sections as asset in C/W-around DM meter in C/W & start backfilling, reinstate black top and clear site
Responsibility for works: Thames Water
Current status: Planned work about to start
Works reference: MU277DM0400
18 August — 12 December
Severe delays likely - Road closure
Works location: o/s 13 to o/s 58A
Works description: traffic scheme footway upgrade paving kerbing with raised table
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC00245249629
The Broadway
17 August — 18 December
Delays possible - Some carriageway incursion
Works location: junction Russell Road
Works description: traffic scheme footway upgrade paving kerbing with raised table
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC00208199772
15 June — 22 December
Delays possible - Some carriageway incursion
Works description: COVID-19 Temporary Safety Measures. Temporary footway widening and build out
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HG011-568756-1