Where else to watch out for road delays in and around SW19
Current roadworks in the Wimbledon area include:
14 August — 18 August
Delays possible - Some carriageway incursion
Works location: Outside 71
Works description: Excavate in the footway/verge to repair damaged chamber - trip hazard - NLO16381
Responsibility for works: VIRGIN MEDIA
Current status: Planned work about to start
Works reference: NK102VM_CIP_385455A
12 August — 18 August
Delays possible - Some carriageway incursion
Works location: DIG IN THE FP AND SPOIL IN THE C.WAY OS 47 APPROACH ROAD
Works description: Network Operations Faults: Essential repair of electricity cables powering street lighting / furniture: EXCAVATION FOR HIGH PRIORITY STREET LIGHT FAULT, DIG IN THE FP, SPOIL AND TEMP WALKWAY IN THE C.WAY
Responsibility for works: UK POWER NETWORKS EASTERN & LONDON
Current status: Work in progress
Works reference: EC40020782063
11 August — 18 August
Delays possible - Traffic control (two-way signals)
Works location: Outside and opposite 311A & 313A, SW20 9BU
Works description: New water connection 2x25mm MDPE MTRD supplies off of 5" CI main excavating 3m footway and 6m carriageway
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU309000810254480165-001
03 August — 25 September
Delays possible - Traffic control (give & take)
Works location: Footway reconstruction works one side at a time
Works description: Footway reconstruction works one side at a time
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC0025567494
Cranford Close, West Wimbledon
27 July — 01 September
Delays possible - Traffic control (multi-way signals)
Works location: WHOLE ROAD, CW & FW
Works description: GAS MAIN REPLACEMENT. TO LAY 95M OF 75MM PE LP MAIN, RELAY 33 SERVICES, MAKE 1 CONNECTION AND ABANDON EXISTING 4" SI MAIN. COMPLETE REINSTATEMENT.
Responsibility for works: SGN
Current status: Planned work about to start
Works reference: XW053W117053400-01674
20 July — 30 October
Severe delays likely - Road closure
Works location: o/s 13 to o/s 58A
Works description: traffic scheme footway upgrade paving kerbing with raised table
Responsibility for works: LONDON BOROUGH OF MERTON
Current status: Planned work about to start
Works reference: HC00245249629
20 July — 30 October
Delays possible - Some carriageway incursion
Works location: Unknown
Works description: traffic scheme footway upgrade paving kerbing with raised table
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC011463552
Wimbledon Bridge, Wimbledon, London, Merton
15 June — 18 November
Delays possible - Some carriageway incursion
Works location: Unknown
Works description: COVID-19 Temporary Safety Measures. Temporary widening of the footway
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC011-565935-1
Worple Road, Wimbledon, London, Merton
15 June — 22 December
Delays possible - Some carriageway incursion
Works location: Unknown
Works description: COVID-19 Temporary Safety Measures. Temporary footway widening and build out
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HG011-568756-1
August 14, 2020