Where else to watch out for road delays in and around SW19
Current roadworks in the Wimbledon area include:
Church Road, Wimbledon Village
07 August — 08 August
Delays possible - Traffic control (multi-way signals)
Works location: J/W High St
Works description: Lay anti-skid to the carriageway
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC00231213852
07 August — 07 August
Delays possible - Some carriageway incursion
Works location: Opposite lamp column 16.
Works description: Install new lamp column.
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC00400001242
07 August — 10 August
Delays possible - Traffic control (multi-way signals)
Works location: O/S 492/494, 30M E OF SYDNEY ROAD
Works description: Replacement of old bus shelter with new 3-bay shelter, back to kerb. TfL shelter ref 0124/0174 (2963051)
Responsibility for works: Transport for London
Current status: Planned work about to start
Works reference: YG471-0124-0174
07 August — 07 August
Delays possible - Some carriageway incursion
Works location: OPP JN GLADSTONE ROAD
Works description: Install new lamp column.
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC00400001241
05 August — 07 August
Delays possible - Some carriageway incursion
Works location: 37 AYLWARD ROAD LONDON SW20 9AJ
Works description: dig required to provide duct for fibre provision
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC007WBNJW00N01
05 August — 11 August
Delays possible - Some carriageway incursion
Works location: os 17 in cway
Works description: Disconnect the gas supply to 15, 15a and 17 in the carriageway under a chapter 8
Responsibility for works: SGN
Current status: Planned work about to start
Works reference: XW047W117295409-05565
Southdown Drive, West Wimbledon
05 August — 07 August
Delays possible - Traffic control (give & take)
Works location: O/S 20 SOUTHDOWN DRIVE
Works description: Interim to permanent
Responsibility for works: VIRGIN MEDIA
Current status: Planned work about to start
Works reference: NK104CIV100341297
03 August — 25 September
Delays possible - Traffic control (give & take)
Works location: Footway reconstruction works one side at a time
Works description: Footway reconstruction works one side at a time
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC0025567494
Cottenham Park Road, West Wimbledon
27 July — 07 August
Delays possible - Traffic control (multi-way signals)
Works location: AT THE JUNCTION WITH CRANFORD CLOSE, CW / FW
Works description: GAS MAIN REPLACEMENT. TO COMPLETE MAINS CONNECTIONS. COMPLETE REINSTATEMENT.
Responsibility for works: SGN
Current status: Planned work about to start
Works reference: XW053W117053449-01632
Cranford Close, West Wimbledon
27 July — 01 September
Delays possible - Traffic control (multi-way signals)
Works location: WHOLE ROAD, CW & FW
Works description: GAS MAIN REPLACEMENT. TO LAY 95M OF 75MM PE LP MAIN, RELAY 33 SERVICES, MAKE 1 CONNECTION AND ABANDON EXISTING 4" SI MAIN. COMPLETE REINSTATEMENT.
Responsibility for works: SGN
Current status: Planned work about to start
Works reference: XW053W117053400-01674
27 July — 31 July
Delays possible - Some carriageway incursion
Works location: OS CORNWALL HOUSE, NS CW
Works description: LAY NEW MAIN TO SITE AT CORNWALL HOUSE, ELM GROVE BUSNIESS PARK, EXCAVATE IN NS CW MAINTAINING NORMAL TRAFFIC FLOW - PUBLIC RIGHT OF WAY SHALL BE MAINTAINED WHILE WORKS ARE CARRIED OUT
Responsibility for works: SGN
Current status: Planned work about to start
Works reference: XW047W117258016-02415
29 July — 05 August
Delays possible - Traffic control (priority working)
Works location: 2B WORPLE ROAD MEWS, SW19 4DB
Works description: Connections Small Service: Electrical service upgrade of customer supply to ensure safe and reliable power supply: 1PH DISC & 3PH INSTALL, ROAD CROSSING REQUIRED. TRAFFIC FLOW TO BE MAINTAINED
Responsibility for works: UK POWER NETWORKS EASTERN & LONDON
Current status: Planned work about to start
Works reference: 120088952
20 July — 30 October
Severe delays likely - Road closure
Works location: o/s 13 to o/s 58A
Works description: traffic scheme footway upgrade paving kerbing with raised table
Responsibility for works: LONDON BOROUGH OF MERTON
Current status: Planned work about to start
Works reference: HC00245249629
20 July — 30 October
Delays possible - Some carriageway incursion
Works location: Unknown
Works description: traffic scheme footway upgrade paving kerbing with raised table
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC011463552
Wimbledon Bridge, Wimbledon, London, Merton
15 June — 18 November
Delays possible - Some carriageway incursion
Works location: Unknown
Works description: COVID-19 Temporary Safety Measures. Temporary widening of the footway
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC011-565935-1
Worple Road, Wimbledon, London, Merton
15 June — 22 December
Delays possible - Some carriageway incursion
Works location: Unknown
Works description: COVID-19 Temporary Safety Measures. Temporary footway widening and build out
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HG011-568756-1