Planned Roadworks In And Around Wimbledon


Where else to watch out for road delays in and around SW19

South Wimbledon roadworks

Current roadworks in the Wimbledon area include:

Church Road, Wimbledon Village

07 August — 08 August 

Delays possible - Traffic control (multi-way signals) 

Works location: J/W High St 

Works description: Lay anti-skid to the carriageway 

Responsibility for works: Merton 

Current status: Planned work about to start 

Works reference: HC00231213852

 

Gladstone Road, Wimbledon

07 August — 07 August 

Delays possible - Some carriageway incursion 

Works location: Opposite lamp column 16. 

Works description: Install new lamp column. 

Responsibility for works: Merton 

Current status: Planned work about to start 

Works reference: HC00400001242

 

Kingston Road, Raynes Park

07 August — 10 August 

Delays possible - Traffic control (multi-way signals) 

Works location: O/S 492/494, 30M E OF SYDNEY ROAD 

Works description: Replacement of old bus shelter with new 3-bay shelter, back to kerb. TfL shelter ref 0124/0174 (2963051) 

Responsibility for works: Transport for London 

Current status: Planned work about to start 

Works reference: YG471-0124-0174

 

Kingston Road, Wimbledon

07 August — 07 August 

Delays possible - Some carriageway incursion 

Works location: OPP JN GLADSTONE ROAD 

Works description: Install new lamp column. 

Responsibility for works: Merton 

Current status: Planned work about to start 

Works reference: HC00400001241

 

Aylward Road

05 August — 07 August 

Delays possible - Some carriageway incursion 

Works location: 37 AYLWARD ROAD LONDON SW20 9AJ 

Works description: dig required to provide duct for fibre provision 

Responsibility for works: Openreach 

Current status: Planned work about to start 

Works reference: BC007WBNJW00N01

 

Russell Road, Wimbledon

05 August — 11 August 

Delays possible - Some carriageway incursion 

Works location: os 17 in cway 

Works description: Disconnect the gas supply to 15, 15a and 17 in the carriageway under a chapter 8 

Responsibility for works: SGN 

Current status: Planned work about to start 

Works reference: XW047W117295409-05565  

 

Southdown Drive, West Wimbledon

05 August — 07 August 

Delays possible - Traffic control (give & take) 

Works location: O/S 20 SOUTHDOWN DRIVE 

Works description: Interim to permanent 

Responsibility for works: VIRGIN MEDIA 

Current status: Planned work about to start 

Works reference: NK104CIV100341297

 

Copse Hill, West Wimbledon

03 August — 25 September 

Delays possible - Traffic control (give & take) 

Works location: Footway reconstruction works one side at a time 

Works description: Footway reconstruction works one side at a time 

Responsibility for works: Merton 

Current status: Planned work about to start 

Works reference: HC0025567494

 

Cottenham Park Road, West Wimbledon

27 July — 07 August 

Delays possible - Traffic control (multi-way signals) 

Works location: AT THE JUNCTION WITH CRANFORD CLOSE, CW / FW 

Works description: GAS MAIN REPLACEMENT. TO COMPLETE MAINS CONNECTIONS. COMPLETE REINSTATEMENT. 

Responsibility for works: SGN 

Current status: Planned work about to start 

Works reference: XW053W117053449-01632

 

Cranford Close, West Wimbledon

27 July — 01 September 

Delays possible - Traffic control (multi-way signals) 

Works location: WHOLE ROAD, CW & FW 

Works description: GAS MAIN REPLACEMENT. TO LAY 95M OF 75MM PE LP MAIN, RELAY 33 SERVICES, MAKE 1 CONNECTION AND ABANDON EXISTING 4" SI MAIN. COMPLETE REINSTATEMENT. 

Responsibility for works: SGN 

Current status: Planned work about to start 

Works reference: XW053W117053400-01674 

 

Elm Grove, Wimbledon

27 July — 31 July 

Delays possible - Some carriageway incursion 

Works location: OS CORNWALL HOUSE, NS CW 

Works description: LAY NEW MAIN TO SITE AT CORNWALL HOUSE, ELM GROVE BUSNIESS PARK, EXCAVATE IN NS CW MAINTAINING NORMAL TRAFFIC FLOW - PUBLIC RIGHT OF WAY SHALL BE MAINTAINED WHILE WORKS ARE CARRIED OUT 

Responsibility for works: SGN 

Current status: Planned work about to start 

Works reference: XW047W117258016-02415

  

Worple Road Mews, Wimbledon

29 July — 05 August 

Delays possible - Traffic control (priority working) 

Works location: 2B WORPLE ROAD MEWS, SW19 4DB 

Works description: Connections Small Service: Electrical service upgrade of customer supply to ensure safe and reliable power supply: 1PH DISC & 3PH INSTALL, ROAD CROSSING REQUIRED. TRAFFIC FLOW TO BE MAINTAINED 

Responsibility for works: UK POWER NETWORKS EASTERN & LONDON 

Current status: Planned work about to start 

Works reference: 120088952 

Russell Road, Wimbledon

20 July — 30 October 

Severe delays likely - Road closure 

Works location: o/s 13 to o/s 58A 

Works description: traffic scheme footway upgrade paving kerbing with raised table 

Responsibility for works: LONDON BOROUGH OF MERTON 

Current status: Planned work about to start 

Works reference: HC00245249629

 

The Broadway, London, Merton

20 July — 30 October 

Delays possible - Some carriageway incursion 

Works location: Unknown 

Works description: traffic scheme footway upgrade paving  kerbing with raised table 

Responsibility for works: Merton 

Current status: Planned work about to start 

Works reference: HC011463552   

Wimbledon Bridge, Wimbledon, London, Merton

15 June — 18 November 

Delays possible - Some carriageway incursion 

Works location: Unknown 

Works description: COVID-19 Temporary Safety Measures. Temporary widening of the footway 

Responsibility for works: Merton 

Current status: Planned work about to start 

Works reference: HC011-565935-1

 

Worple Road, Wimbledon, London, Merton

15 June — 22 December 

Delays possible - Some carriageway incursion 

Works location: Unknown 

Works description: COVID-19 Temporary Safety Measures. Temporary footway widening and build out

Responsibility for works: Merton 

Current status: Planned work about to start 

Works reference: HG011-568756-1