Where else to watch out for road delays in and around SW19
Current roadworks in the Wimbledon area include:
Cottenham Park Road, West Wimbledon
27 July — 07 August
Delays possible - Traffic control (multi-way signals)
Works location: AT THE JUNCTION WITH CRANFORD CLOSE, CW / FW
Works description: GAS MAIN REPLACEMENT. TO COMPLETE MAINS CONNECTIONS. COMPLETE REINSTATEMENT.
Responsibility for works: SGN
Current status: Planned work about to start
Works reference: XW053W117053449-01632
Cranford Close, West Wimbledon
27 July — 01 September
Delays possible - Traffic control (multi-way signals)
Works location: WHOLE ROAD, CW & FW
Works description: GAS MAIN REPLACEMENT. TO LAY 95M OF 75MM PE LP MAIN, RELAY 33 SERVICES, MAKE 1 CONNECTION AND ABANDON EXISTING 4" SI MAIN. COMPLETE REINSTATEMENT.
Responsibility for works: SGN
Current status: Planned work about to start
Works reference: XW053W117053400-01674
28 July — 30 July
Delays possible - Some carriageway incursion
Works location: OUTSIDE 22
Works description: Rectify self defect in the Carriageway
Responsibility for works: Thames Water
Current status: Planned work about to start
Works reference: MU302000031457377-003
28 July — 30 July
Delays possible - Traffic control (give & take)
Works location: jw Arterberry Rd.
Works description: RS 28day b-out restore potholes in cw 5.7m x4.8m, plus 1sqm on south side of j
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC00187152255
27 July — 31 July
Delays possible - Some carriageway incursion
Works location: OS CORNWALL HOUSE, NS CW
Works description: LAY NEW MAIN TO SITE AT CORNWALL HOUSE, ELM GROVE BUSNIESS PARK, EXCAVATE IN NS CW MAINTAINING NORMAL TRAFFIC FLOW - PUBLIC RIGHT OF WAY SHALL BE MAINTAINED WHILE WORKS ARE CARRIED OUT
Responsibility for works: SGN
Current status: Planned work about to start
Works reference: XW047W117258016-02415
Melbury Gardens, West Wimbledon
28 July — 30 July
Delays possible - Some carriageway incursion
Works location: 54
Works description: Service Pipe Repair <33mm Cway & Fway in Carriageway. Ourintention is to complete the Permanent Reinstatement in the same phase
Responsibility for works: Thames Water
Current status: Planned work about to start
Works reference: MU302000031476439-001
27 July — 29 July
Delays possible - Some carriageway incursion
Works location: 17
Works description: SUPPLY AND EXECUTE FOOTWAY CROSSOVER WORKS
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC00158835042
28 July — 30 July
Delays possible - Traffic control (give & take)
Works location: OUTSIDE 9
Works description: Rectify self defect in the Carriageway
Responsibility for works: Thames Water
Current status: Planned work about to start
Works reference: MU302000031474622-002
29 July — 05 August
Delays possible - Traffic control (priority working)
Works location: 2B WORPLE ROAD MEWS, SW19 4DB
Works description: Connections Small Service: Electrical service upgrade of customer supply to ensure safe and reliable power supply: 1PH DISC & 3PH INSTALL, ROAD CROSSING REQUIRED. TRAFFIC FLOW TO BE MAINTAINED
Responsibility for works: UK POWER NETWORKS EASTERN & LONDON
Current status: Planned work about to start
Works reference: 120088952
24 July — 28 July
Delays possible - Some carriageway incursion
Works location: outside 11/15.
Works description: RS 28day b-out ASP 2x600 1x900 slabs. B-out restore whole area in bitmac 2.7m
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC00172504519
24 July — 28 July
Delays possible - Some carriageway incursion
Works location: outside 87
Works description: RS 28day re-lay raised 600mm ASP slab at rear of fw.
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC00103572760
24 July — 28 July
Delays possible - Some carriageway incursion
Works location: north side of jw Alt Grove.
Works description: RS 28day supply new post to replace damaged cycle route post.
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC00106687977
24 July — 28 July
Delays possible - Some carriageway incursion
Works location: o/s itsu
Works description: Remove 1x750 slab where cracked, lifted and replace
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC00104745801
20 July — 30 October
Severe delays likely - Road closure
Works location: o/s 13 to o/s 58A
Works description: traffic scheme footway upgrade paving kerbing with raised table
Responsibility for works: LONDON BOROUGH OF MERTON
Current status: Planned work about to start
Works reference: HC00245249629
Cottenham Park Road, West Wimbledon
23 July — 29 July
Delays possible - Some carriageway incursion
Works location: 4, 4a & 4b Cottenham Park Road, SW20 0RZ
Works description: Connections Small Service: Installation of a new electricity supply for a customer: 2 new single phase connection excavate in f/way. Bus stop to be suspended for temp walkway, traffic flow to be maintained
Responsibility for works: UK POWER NETWORKS EASTERN & LONDON
Current status: Planned work about to start
Works reference: 120091103
22 July — 27 July
Delays possible - Traffic control (multi-way signals)
Works location: Junction of Edna Road & Kingston Road, SW20 8SA
Works description: Permit for traffic light head for works under permit MU309000810113520295-001
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU309000810113520295-002
22 July — 27 July
Delays possible - Traffic control (multi-way signals)
Works location: Outside 591-593 Kingston Road, SW20 8SA
Works description: New water connection, 3x6 port B/P MTRD manifolds off of 7" CI main excavating in footway
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU309000810113520295-001
23 July — 27 July
Delays possible - Some carriageway incursion
Works location: O/S Ursuline Covent Preparatory School, The Downs
Works description: Build C/W1 Chamber (Dropcurb)
Responsibility for works: VIRGIN MEDIA
Current status: Planned work about to start
Works reference: NK104CIV100348479
23 July — 27 July
Delays possible - Some carriageway incursion
Works location: O/S URSULINE PREPARATORY SCHOOL ON THE DOWNS
Works description: Build C/W1 Chamber (Dropkerb)
Responsibility for works: VIRGIN MEDIA
Current status: Planned work about to start
Works reference: NK104CIV100347034
20 July — 30 October
Delays possible - Some carriageway incursion
Works location: Unknown
Works description: traffic scheme footway upgrade paving kerbing with raised table
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC011463552
Wimbledon Bridge, Wimbledon, London, Merton
15 June — 18 November
Delays possible - Some carriageway incursion
Works location: Unknown
Works description: COVID-19 Temporary Safety Measures. Temporary widening of the footway
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC011-565935-1
Worple Road, Wimbledon, London, Merton
15 June — 22 December
Delays possible - Some carriageway incursion
Works location: Unknown
Works description: COVID-19 Temporary Safety Measures. Temporary footway widening and build out
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HG011-568756-1
July 27, 2020