Planned Roadworks In And Around Wimbledon


Where else to watch out for road delays in and around SW19

South Wimbledon roadworks

Current roadworks in the Wimbledon area include:

 

Cottenham Park Road, West Wimbledon

27 July — 07 August 

Delays possible - Traffic control (multi-way signals) 

Works location: AT THE JUNCTION WITH CRANFORD CLOSE, CW / FW 

Works description: GAS MAIN REPLACEMENT. TO COMPLETE MAINS CONNECTIONS. COMPLETE REINSTATEMENT. 

Responsibility for works: SGN 

Current status: Planned work about to start 

Works reference: XW053W117053449-01632

 

Cranford Close, West Wimbledon

27 July — 01 September 

Delays possible - Traffic control (multi-way signals) 

Works location: WHOLE ROAD, CW & FW 

Works description: GAS MAIN REPLACEMENT. TO LAY 95M OF 75MM PE LP MAIN, RELAY 33 SERVICES, MAKE 1 CONNECTION AND ABANDON EXISTING 4" SI MAIN. COMPLETE REINSTATEMENT. 

Responsibility for works: SGN 

Current status: Planned work about to start 

Works reference: XW053W117053400-01674 

 

Dorien Road, Raynes Park

28 July — 30 July 

Delays possible - Some carriageway incursion 

Works location: OUTSIDE 22 

Works description: Rectify self defect in the Carriageway 

Responsibility for works: Thames Water 

Current status: Planned work about to start 

Works reference: MU302000031457377-003 

 

Dunmore Road, West Wimbledon

28 July — 30 July 

Delays possible - Traffic control (give & take) 

Works location: jw Arterberry Rd. 

Works description: RS 28day b-out restore potholes in cw 5.7m x4.8m, plus 1sqm on south side of j 

Responsibility for works: Merton 

Current status: Planned work about to start 

Works reference: HC00187152255

 

Elm Grove, Wimbledon

27 July — 31 July 

Delays possible - Some carriageway incursion 

Works location: OS CORNWALL HOUSE, NS CW 

Works description: LAY NEW MAIN TO SITE AT CORNWALL HOUSE, ELM GROVE BUSNIESS PARK, EXCAVATE IN NS CW MAINTAINING NORMAL TRAFFIC FLOW - PUBLIC RIGHT OF WAY SHALL BE MAINTAINED WHILE WORKS ARE CARRIED OUT 

Responsibility for works: SGN 

Current status: Planned work about to start 

Works reference: XW047W117258016-02415

 

Melbury Gardens, West Wimbledon

28 July — 30 July 

Delays possible - Some carriageway incursion 

Works location: 54 

Works description: Service Pipe Repair <33mm Cway & Fway in Carriageway. Ourintention is to complete the Permanent Reinstatement in the same phase 

Responsibility for works: Thames Water 

Current status: Planned work about to start 

Works reference: MU302000031476439-001

 

Parkside Gardens, Wimbledon

27 July — 29 July 

Delays possible - Some carriageway incursion 

Works location: 17 

Works description: SUPPLY AND EXECUTE FOOTWAY CROSSOVER WORKS 

Responsibility for works: Merton 

Current status: Planned work about to start 

Works reference: HC00158835042 

  

Sherwood Road, Wimbledon

28 July — 30 July 

Delays possible - Traffic control (give & take) 

Works location: OUTSIDE 9 

Works description: Rectify self defect in the Carriageway 

Responsibility for works: Thames Water 

Current status: Planned work about to start 

Works reference: MU302000031474622-002

  

Worple Road Mews, Wimbledon

29 July — 05 August 

Delays possible - Traffic control (priority working) 

Works location: 2B WORPLE ROAD MEWS, SW19 4DB 

Works description: Connections Small Service: Electrical service upgrade of customer supply to ensure safe and reliable power supply: 1PH DISC & 3PH INSTALL, ROAD CROSSING REQUIRED. TRAFFIC FLOW TO BE MAINTAINED 

Responsibility for works: UK POWER NETWORKS EASTERN & LONDON 

Current status: Planned work about to start 

Works reference: 120088952

 

Hunter Road, Raynes Park

24 July — 28 July 

Delays possible - Some carriageway incursion 

Works location: outside 11/15. 

Works description: RS 28day b-out ASP 2x600 1x900 slabs. B-out restore whole area in bitmac 2.7m 

Responsibility for works: Merton 

Current status: Planned work about to start 

Works reference: HC00172504519 

 

Richmond Road

24 July — 28 July 

Delays possible - Some carriageway incursion 

Works location: outside 87 

Works description: RS 28day re-lay raised 600mm ASP slab at rear of fw. 

Responsibility for works: Merton 

Current status: Planned work about to start 

Works reference: HC00103572760  

 

St George's Road

24 July — 28 July 

Delays possible - Some carriageway incursion 

Works location: north side of jw Alt Grove. 

Works description: RS 28day supply new post to replace damaged cycle route post. 

Responsibility for works: Merton 

Current status: Planned work about to start 

Works reference: HC00106687977 

 

Wimbledon Bridge, Wimbledon

24 July — 28 July 

Delays possible - Some carriageway incursion 

Works location: o/s itsu 

Works description: Remove 1x750 slab where cracked, lifted and replace 

Responsibility for works: Merton 

Current status: Planned work about to start 

Works reference: HC00104745801

Russell Road, Wimbledon

20 July — 30 October 

Severe delays likely - Road closure 

Works location: o/s 13 to o/s 58A 

Works description: traffic scheme footway upgrade paving kerbing with raised table 

Responsibility for works: LONDON BOROUGH OF MERTON 

Current status: Planned work about to start 

Works reference: HC00245249629

 

Cottenham Park Road, West Wimbledon

23 July — 29 July 

Delays possible - Some carriageway incursion 

Works location: 4, 4a & 4b Cottenham Park Road, SW20 0RZ 

Works description: Connections Small Service: Installation of a new electricity supply for a customer: 2 new single phase connection excavate in f/way. Bus stop to be suspended for temp walkway, traffic flow to be maintained 

Responsibility for works: UK POWER NETWORKS EASTERN & LONDON 

Current status: Planned work about to start 

Works reference: 120091103

 

Edna Road, Raynes Park

22 July — 27 July 

Delays possible - Traffic control (multi-way signals) 

Works location: Junction of Edna Road & Kingston Road, SW20 8SA 

Works description: Permit for traffic light head for works under permit MU309000810113520295-001 

Responsibility for works: THAMES WATER 

Current status: Planned work about to start 

Works reference: MU309000810113520295-002

 

Kingston Road, Raynes Park

22 July — 27 July 

Delays possible - Traffic control (multi-way signals) 

Works location: Outside 591-593 Kingston Road, SW20 8SA 

Works description: New water connection, 3x6 port B/P MTRD manifolds off of 7" CI main excavating in footway 

Responsibility for works: THAMES WATER 

Current status: Planned work about to start 

Works reference: MU309000810113520295-001

The Downs, West Wimbledon

23 July — 27 July 

Delays possible - Some carriageway incursion 

Works location: O/S Ursuline Covent Preparatory School, The Downs 

Works description: Build C/W1 Chamber (Dropcurb) 

Responsibility for works: VIRGIN MEDIA 

Current status: Planned work about to start 

Works reference: NK104CIV100348479

 

The Downs, West Wimbledon

23 July — 27 July 

Delays possible - Some carriageway incursion 

Works location: O/S URSULINE PREPARATORY SCHOOL ON THE DOWNS 

Works description: Build C/W1 Chamber (Dropkerb) 

Responsibility for works: VIRGIN MEDIA 

Current status: Planned work about to start 

Works reference: NK104CIV100347034

The Broadway, London, Merton

20 July — 30 October 

Delays possible - Some carriageway incursion 

Works location: Unknown 

Works description: traffic scheme footway upgrade paving  kerbing with raised table 

Responsibility for works: Merton 

Current status: Planned work about to start 

Works reference: HC011463552   

Wimbledon Bridge, Wimbledon, London, Merton

15 June — 18 November 

Delays possible - Some carriageway incursion 

Works location: Unknown 

Works description: COVID-19 Temporary Safety Measures. Temporary widening of the footway 

Responsibility for works: Merton 

Current status: Planned work about to start 

Works reference: HC011-565935-1

 

Worple Road, Wimbledon, London, Merton

15 June — 22 December 

Delays possible - Some carriageway incursion 

Works location: Unknown 

Works description: COVID-19 Temporary Safety Measures. Temporary footway widening and build out

Responsibility for works: Merton 

Current status: Planned work about to start 

Works reference: HG011-568756-1

July 27, 2020