Planned Roadworks In And Around Wimbledon


Where else to watch out for road delays in and around SW19

South Wimbledon roadworks

Current roadworks in the Wimbledon area include:

The Broadway, London, Merton

01 July — 03 July 

Delays likely - Traffic control (give & take) 

Works location: Unknown 

Works description: viafix 0.250 cway at side of Thames Water cover 

Responsibility for works: Merton 

Current status: Planned work about to start 

Works reference: HC011-572731-1

  

Coombe Lane, Raynes Park, London, Merton

01 July — 03 July 

Delays possible - Some carriageway incursion 

Works location: Unknown 

Works description: RS 28day b-out restore rear of bitmac fw 3m x1.6m & 0.7m x0.6m. 

Responsibility for works: Merton 

Current status: Planned work about to start 

Works reference: HC011-572752-1
 

Wimbledon Bridge, Wimbledon, London, Merton

15 June — 18 November 

Delays possible - Some carriageway incursion 

Works location: Unknown 

Works description: COVID-19 Temporary Safety Measures. Temporary widening of the footway 

Responsibility for works: Merton 

Current status: Planned work about to start 

Works reference: HC011-565935-1

 

Worple Road, Wimbledon, London, Merton

15 June — 22 December 

Delays possible - Some carriageway incursion 

Works location: Unknown 

Works description: COVID-19 Temporary Safety Measures. Temporary footway widening and build out 

Responsibility for works: Merton 

Current status: Planned work about to start 

Works reference: HC011-568756-1

Copse Hill, West Wimbledon, London, Merton

30 June — 02 July 

Delays possible - Some carriageway incursion 

Works location: Unknown 

Works description: Reinstate footway in Footway. Our intention is to complete the Permanent Reinstatement in the same phase 

Responsibility for works: THAMES WATER 

Current status: Planned work about to start 

Works reference: MU302000031438444-001

 

July 1, 2020