Where else to watch out for road delays in and around SW19
Current roadworks in the Wimbledon area include:
01 July — 03 July
Delays likely - Traffic control (give & take)
Works location: Unknown
Works description: viafix 0.250 cway at side of Thames Water cover
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC011-572731-1
Coombe Lane, Raynes Park, London, Merton
01 July — 03 July
Delays possible - Some carriageway incursion
Works location: Unknown
Works description: RS 28day b-out restore rear of bitmac fw 3m x1.6m & 0.7m x0.6m.
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC011-572752-1
Wimbledon Bridge, Wimbledon, London, Merton
15 June — 18 November
Delays possible - Some carriageway incursion
Works location: Unknown
Works description: COVID-19 Temporary Safety Measures. Temporary widening of the footway
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC011-565935-1
Worple Road, Wimbledon, London, Merton
15 June — 22 December
Delays possible - Some carriageway incursion
Works location: Unknown
Works description: COVID-19 Temporary Safety Measures. Temporary footway widening and build out
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC011-568756-1
Copse Hill, West Wimbledon, London, Merton
30 June — 02 July
Delays possible - Some carriageway incursion
Works location: Unknown
Works description: Reinstate footway in Footway. Our intention is to complete the Permanent Reinstatement in the same phase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU302000031438444-001
July 1, 2020