Planned Roadworks In And Around Wimbledon


Where else to watch out for road delays in and around SW19

South Wimbledon roadworks

Current roadworks in the Wimbledon area include:

Kingston Road, Raynes Park, London, Merton

23 June — 26 June 

Delays likely - Traffic control (multi-way signals) 

Works location: Unknown 

Works description: New water connection 3 x 6 port MDPE MTRD and 2 x disconnection off 7" CI main excavating 1m footway. Our intension is to complete the permanent reinstatement in the same phase 

Responsibility for works: THAMES WATER 

Current status: Planned work about to start 

Works reference: MU309000810113520295-001 


Ridgway, Wimbledon, London, Merton

22 June — 26 June 

Delays likely - Traffic control (two-way signals) 

Works location: Unknown 

Works description: Connections Highway Services:Works on behalf of local authority (Works For Road Purposes) :NEW SERVICE TO A LAMP COLUMN 

Responsibility for works: Merton 

Current status: Planned work about to start 

Works reference: HC00850027520

 

Ridgway, Wimbledon, London, Merton

22 June — 26 June 

Delays likely - Traffic control (two-way signals) 

Works location: Unknown 

Works description: Connections Highway Services:Works on behalf of local authority (Works For Road Purposes) :DISCONNECTION TO A LAMP COLUMN 

Responsibility for works: Merton 

Current status: Planned work about to start 

Works reference: HC00850027140  

 

Ridgway, Wimbledon, London, Merton

22 June — 26 June 

Delays likely - Traffic control (two-way signals) 

Works location: Unknown 

Works description: Connections Highway Services:Works on behalf of local authority (Works For Road Purposes) :NEW SERVICE TO A COLUMN 

Responsibility for works: Merton 

Current status: Planned work about to start 

Works reference: HC00850027030

 

Edna Road, Raynes Park, London, Merton

23 June — 26 June 

Delays possible - Traffic control (multi-way signals) 

Works location: Unknown 

Works description: Permit for traffic light head for works under permit MU309000810113520295-001 

Responsibility for works: THAMES WATER 

Current status: Planned work about to start 

Works reference: MU309000810113520295-002

Gladstone Road, Wimbledon, London, Merton

19 June — 23 June 

Delays likely - Traffic control (give & take) 

Works location: Unknown 

Works description: d 28 day c way breaking out, break out and reinstate area 5.4 x 1.6 difficult 

Responsibility for works: Merton 

Current status: Planned work about to start 

Works reference: HC011-569763-1

 

High Street, Wimbledon, London, Merton

20 June — 24 June 

Delays likely - Traffic control (give & take) 

Works location: Unknown 

Works description: RS 28day b-out restore potholes in cw 11m x1m 

Responsibility for works: Merton 

Current status: Planned work about to start 

Works reference: HC011-570629-1

 

Wimbledon Hill Road, Wimbledon, London, Merton

20 June — 24 June 

Delays likely - Traffic control (give & take) 

Works location: Unknown 

Works description: RS 28day b-out to minimum 100mm depth and restore potholes (3.40 x 1.60) in cw 

Responsibility for works: Merton 

Current status: Planned work about to start 

Works reference: HC011-570650-1  

 

Wimbledon Hill Road, Wimbledon, London, Merton

20 June — 24 June

 Delays possible - Some carriageway incursion 

Works location: Unknown

 Works description: RS 28day b-out to minimum 100mm depth & restore potholes (7.60 x 1.70) in cw 

Responsibility for works: Merton 

Current status: Planned work about to start 

Works reference: HC011-570645-1
 

Wimbledon Bridge, Wimbledon, London, Merton

15 June — 18 November 

Delays possible - Some carriageway incursion 

Works location: Unknown 

Works description: COVID-19 Temporary Safety Measures. Temporary widening of the footway 

Responsibility for works: Merton 

Current status: Planned work about to start 

Works reference: HC011-565935-1

 

Worple Road, Wimbledon, London, Merton

15 June — 22 December 

Delays possible - Some carriageway incursion 

Works location: Unknown 

Works description: COVID-19 Temporary Safety Measures. Temporary footway widening and build out 

Responsibility for works: Merton 

Current status: Planned work about to start 

Works reference: HC011-568756-1

 

June 22, 2020