Planned Roadworks In And Around Wimbledon


Where else to watch out for road delays in and around SW19

South Wimbledon roadworks

Current roadworks in the Wimbledon area include:

Mostyn Road, London, Merton

27 April — 15 May 

Delays possible - Traffic control (multi-way signals) 

Works location: Unknown 

Works description: WORKING ON BEHALF OF THAMES WATER - MAINS RENEWAL - 1060M OF DIRECTIONAL DRILLING - 175 SERVICE TRANSFERS & 12 MAINS CONNECTIONS 

Responsibility for works: THAMES WATER 

Current status: Advanced planning 

Works reference: MU821H577/MSU009/D001

 

A298 Bushey Road, Raynes Park, London, Merton

20 April — 11 May 

Delays likely - Traffic control (multi-way signals) 

Works location: Unknown 

Works description: Thames Water works to repair leak on 42" Main in Carriageway 

Responsibility for works: THAMES WATER 

Current status: Planned work about to start 

Works reference: MU032PTML238875-01

 

Queen's Road, Wimbledon, London, Merton

20 April — 01 June 

Delays likely - Road closure 

Works location: Unknown 

Works description: Lay 141mtrs of 125mmPE. Abandon 141mtrs of 6"CI. Complete all services. Complete all connections. Complete all reinstatement. 

Responsibility for works: SGN 

Current status: Planned work about to start 

Works reference: XW053W116890673-05247 

  

Thornton Hill, Wimbledon, London, Merton

02 March — 25 May

Delays likely - Road closure 

Works location: Unknown

Works description: Lay 240mtrs 125mm PE. Abandon 240mtrs of 6" CI. Complete all services. Make 2 mains connections. Complete all reinstatement.

Responsibility for works: SGN

Current status: Planned work about to start

Works reference: XW053W116411299-06264 

The Downs, West Wimbledon, London, Merton

14 April — 27 April 

Delays possible - Lane closure 

Works location: Unknown 

Works description: Network Operations Distribution:Install / Replace / Remove electrical link box:Disconnect and remove equipment from sub-stn 06383 after excavating a LV cable trench, laying of a duct and cable, excavation of 2No joint holes and HV/LV jointing thereof. 

Responsibility for works: UK POWER NETWORKS EASTERN & LONDON 

Current status: Planned work about to start 

Works reference: EC40010778127