Where else to watch out for road delays in and around SW19
Current roadworks in the Wimbledon area include:
B235 Alexandra Road, Wimbledon, London, Merton
22 April — 23 April
Delays likely - Traffic control (two-way signals)
Works location: Unknown
Works description: ESC:CCTV & CLEAN AS REQ TO SURVEY (WITH REPORT) BOTH S/W & F/W MAINS SEWERS 30M U/S & D/S FROM 121C (FOUL) & 40M D/S 1202 (S/W). CUSTOMER COMPLAINT. THINKS HOUSE IFALLING DOWN DUE TO FAULT IN OUR SEWER.
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU026002252HTXC--000003
B235 Alexandra Road, Wimbledon, London, Merton
22 April — 23 April
Delays likely - Traffic control (two-way signals)
Works location: Unknown
Works description: ESC:CCTV & CLEAN AS REQ TO SURVEY (WITH REPORT) BOTH S/W & F/W MAINS SEWERS 30M U/S & D/S FROM 121C (FOUL) & 40M D/S 1202 (S/W). CUSTOMER COMPLAINT. THINKS HOUSE IFALLING DOWN DUE TO FAULT IN OUR SEWER.
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU026002252HTXC--000004
Lower Downs Road, Raynes Park, London, Merton
22 April — 24 April
Delays possible - Traffic control (give & take)
Works location: Unknown
Works description: d 28 day c way breaking out, break out and reinstate area 3.5 x 2m 1.2 x .600
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC011-546715-1
A238,B279 Approach Road, Raynes Park, London, Merton
20 April — 22 April
Delays likely - Traffic control (give & take)
Works location: Unknown
Works description: d 28 day c way breaking out, break out and reinstate area 4.2 x .200
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC011-546713-1
A298 Bushey Road, Raynes Park, London, Merton
20 April — 11 May
Delays likely - Traffic control (multi-way signals)
Works location: Unknown
Works description: Thames Water works to repair leak on 42" Main in Carriageway
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU032PTML238875-01
Queen's Road, Wimbledon, London, Merton
20 April — 01 June
Delays likely - Road closure
Works location: Unknown
Works description: Lay 141mtrs of 125mmPE. Abandon 141mtrs of 6"CI. Complete all services. Complete all connections. Complete all reinstatement.
Responsibility for works: SGN
Current status: Planned work about to start
Works reference: XW053W116890673-05247
Thornton Hill, Wimbledon, London, Merton
02 March — 25 May
Delays likely - Road closure
Works location: Unknown
Works description: Lay 240mtrs 125mm PE. Abandon 240mtrs of 6" CI. Complete all services. Make 2 mains connections. Complete all reinstatement.
Responsibility for works: SGN
Current status: Planned work about to start
Works reference: XW053W116411299-06264
A238 Kingston Road, Raynes Park, London, Merton
18 April — 22 April
Delays likely - Traffic control (two-way signals)
Works location: Unknown
Works description: Replace 1 jointbox frame and cover(s) (1310mm x 610mm) in Footway
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC006TI001LC500296229700
The Downs, West Wimbledon, London, Merton
14 April — 27 April
Delays possible - Lane closure
Works location: Unknown
Works description: Network Operations Distribution:Install / Replace / Remove electrical link box:Disconnect and remove equipment from sub-stn 06383 after excavating a LV cable trench, laying of a duct and cable, excavation of 2No joint holes and HV/LV jointing thereof.
Responsibility for works: UK POWER NETWORKS EASTERN & LONDON
Current status: Planned work about to start
Works reference: EC40010778127
April 21, 2020