A219 Hartfield Road, London, Merton
05 November — 07 November
Delays likely - Traffic control (two-way signals)
Works location: Unknown
Works description: Install 2m of 1 way poly duct in Footway
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC006TI001LC500288036100
Cannon Hill Lane, Raynes Park, London, Merton
04 November — 15 November
Delays likely - Road closure
Works location: Unknown
Works description: Sewer repairs in carriageway - Relating to collapsed pipework
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU026002252CPDM--0001
A219 Wimbledon Hill Road, Wimbledon, London, Merton
03 November — 06 November
Delays possible - Some carriageway incursion
Works location: Unknown
Works description: install 15m of new track in footway and a FW3 chamber
Responsibility for works: VIRGIN MEDIA
Current status: Planned work about to start
Works reference: NK100/SSEMBU/100315023
B281 Copse Hill, West Wimbledon, London, Merton
01 November — 05 November
Delays possible - Some carriageway incursion
Works location: Unknown
Works description: RS 28day b-out restore bitmac front verge 1.5m x1m.
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC011-498298-1
B282 West Barnes Lane, London, Merton
29 October — 02 December
Delays likely - Traffic control (multi-way signals)
Works location: Unknown
Works description: Live insert from Bodnant Gardens to Farnham Gardens, Live transfer second 90mm service to school (by roundabout), Excavate and transfer first 6”PVC main, Excavate and transfer second 6”PVC main, Retrieve live head and tie in to 180mm main
Responsibility for works: SGN
Current status: Planned work about to start
Works reference: XW053W116435500-06627
B281 West Side Common, Wimbledon
24 October — 06 November
Delays possible - Some carriageway incursion
Works description: Network Operations Distribution:Install / Replace / Remove ground mounted switchgear / transformers:joint holes to replace switchgear of substation
Responsibility for works: UK POWER NETWORKS EASTERN & LONDON
Current status: Planned work about to start
Works reference: EC40010771995
|