Traffic disruption and diversions may occur due to lane and road closures
Below is a list of forthcoming roadworks in the SW19 area which are likely to cause some local delays:
12 August — 15 August |
|
|
||
Delays likely Traffic control (two-way signals) |
|
|||
Works location: Unknown |
|
|
||
Works description: New water connection 1x25mm MDPE MTRD supply off of 6" CI main excavating 3m footway and 2m carriageway |
|
|
||
Responsibility for works: THAMES WATER |
|
|
||
Current status: Planned work about to start |
|
|
||
Works reference: MU309000808209530170-001 |
|
|
12 August — 16 August |
|
|
||
Delays likely Traffic control (two-way signals) |
|
|||
Works location: Unknown |
|
|
||
Works description: Lay new services to 198. All works to start after 09:30am. Excavating in N/S F/W whilst maintaining a minimum width of 1.2m for pedestrians when NOT working onsite using footway boards. Maintaining 1m for peds when working onsite. Excavate in N/S C/W which we will maintain by using 2 WAY LIGHTS |
|
|
||
Responsibility for works: SGN |
|
|
||
Current status: Planned work about to start |
|
|
||
Works reference: XW047W116367171-06884 |
|
|
12 August — 15 August |
|
|
||
Delays likely Lane closure |
|
|||
Works location: Unknown |
|
|
||
Works description: DISTRICT METER AND WASH OUT INSTALL IN F/W AND C/W |
|
|
||
Responsibility for works: THAMES WATER |
|
|
||
Current status: Planned work about to start |
|
|
||
Works reference: MU277DM06367 |
|
|
13 August — 15 August |
|
|
||
Delays likely Traffic control (multi-way signals) |
|
|||
Works location: Unknown |
|
|
||
Works description: SUB DUCT AND CABLING.TO ROD ROPE AND TEST, AND INSTALL APPROX 300M OF SUB DUCT AND CABLE ONLY. ANY ASSOCIATED BLOCKAGES IN EXISTING FW/CW/VERGE - SPINE ROUTE TO EXCHANGE TO LOCATE AND EXCAVATE TO CLEAR BLOCKAGES ON EXISTING BT UNDERGROUND INFRASTRUCTURE-WORKS AREA WILL BE NO BIGGER THAN 3m FOR EACH BLOCKAGE LOCATION. |
|
|
||
Responsibility for works: Openreach |
|
|
||
Current status: Planned work about to start |
|
|
||
Works reference: BC005KN1W000MRTNPRK-NS15 |
|
|
13 August — 15 August |
|
|
Delays likely Lane closure |
|
|
Works location: Unknown |
|
|
Works description: SUB DUCT AND CABLING.TO ROD ROPE AND TEST, AND INSTALL APPROX 300M OF SUB DUCT AND CABLE ONLY. ANY ASSOCIATED BLOCKAGES IN EXISTING FW/CW/VERGE - SPINE ROUTE TO EXCHANGE TO LOCATE AND EXCAVATE TO CLEAR BLOCKAGES ON EXISTING BT UNDERGROUND INFRASTRUCTURE-WORKS AREA WILL BE NO BIGGER THAN 3m FOR EACH BLOCKAGE LOCATION. |
|
|
Responsibility for works: Openreach |
|
|
Current status: Planned work about to start |
|
|
Works reference: BC005KN1W000MRTNPRK-NS19 |
|
|
13 August — 17 August |
|
|
Delays likely Traffic control (Stop/Go boards) |
|
|
Works location: Unknown |
|
|
Works description: DESILT CHAMBER IN FOOTWAY FOR CUSTOMER CONNECTION |
|
|
Responsibility for works: VIRGIN MEDIA |
|
|
Current status: Planned work about to start |
|
|
Works reference: NK100/SCLJBU/116740/LBC6 |
|
|
09 August — 13 August |
|
|
Delays likely Traffic control (priority working) |
|
|
Works location: Unknown |
|
|
Works description: Clear C/W Blockage |
|
|
Responsibility for works: VIRGIN MEDIA |
|
|
Current status: Planned work about to start |
|
|
Works reference: NK100/SSEMBU/100292163 |
|
|
10 August — 13 August |
|
|
Delays likely Traffic control (multi-way signals) |
|
|
Works location: Unknown |
|
|
Works description: Rectifiy reinstatement defect - non-pay in Carriageway. Our intention isto complete the Permanent Reinstatement in the same phase |
|
|
Responsibility for works: THAMES WATER |
|
|
Current status: Planned work about to start |
|
|
Works reference: MU302000031070807-001 |
|
|
August 12, 2019