Traffic disruption and diversions may occur due to lane and road closures
Below is a list of forthcoming roadworks in the SW19 area which are likely to cause some local delays:
29 March — 02 April |
|
|
||
Delays likely Traffic control (Stop/Go boards) |
|
|||
Works location: Unknown |
|
|
||
Works description: Carriageway - breaking out, break out 100mm and reinstate 60mm binder course |
|
|
||
Responsibility for works: Merton |
|
|
||
Current status: Planned work about to start |
|
|
||
Works reference: HC011-405400-1B |
|
|
28 March — 29 March |
|
|
||
Delays likely Traffic control (multi-way signals) |
|
|||
Works location: Unknown |
|
|
||
Works description: ENTRY INTO EXISITNG MANHOLE TO INSTALL LEVEL MONITORING EQUIPMENT. APPROMIMATELY 2 HOUR DURATION WITH NO EXCAVATION WORK |
|
|
||
Responsibility for works: THAMES WATER |
|
|
||
Current status: Planned work about to start |
|
|
||
Works reference: MU820H032/CWST/AH056 |
|
|
29 March — 02 April |
|
|
Delays likely Traffic control (Stop/Go boards) |
|
|
Works location: Unknown |
|
|
Works description: RVS 28day 100mm deep HRA cw repair to potholes in cw channel 4.4m x1.9m & 8m x 2m |
|
|
Responsibility for works: Merton |
|
|
Current status: Planned work about to start |
|
|
Works reference: HC011-439223-1 |
|
|
29 March — 29 March |
|
|
Delays likely Traffic control (multi-way signals) |
|
|
Works location: Unknown |
|
|
Works description: S81 PLANNED COVER REPLACEMENT--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE |
|
|
Responsibility for works: THAMES WATER |
|
|
Current status: Planned work about to start |
|
|
Works reference: MU026002251XVFQ--000008 |
|
|
29 March — 02 April |
|
|
Delays likely Traffic control (Stop/Go boards) |
|
|
Works location: Unknown |
|
|
Works description: RVS 28day 200mm deep HRA cw repair to potholes in cw channel 1.8m x1.6m & 2.1m |
|
|
Responsibility for works: Merton |
|
|
Current status: Planned work about to start |
|
|
Works reference: HC011-439211-1 |
|
|
March 27, 2019