Road Works Ahead in the Wimbledon Area


Traffic disruption and diversions may occur

Below is a list of forthcoming roadworks in the SW19 area which are likely to cause some local delays:

A238 Kingston Road, Raynes Park, London, Merton
13 February — 14 February
Delays likely Traffic control (two-way signals)
Works location: A238
Works description: New Water Connection 1x63mm B/P Mtrd Supply 7'' Ci Main 4m C/W 3m F/W
Responsibility for works: Thames Water
Current status: Planned work about to start
B281 Copse Hill, West Wimbledon, London, Merton
13 February — 14 February
Delays likely Traffic control (Stop/Go boards)
Works location: B281
Works description: Self Defect In Carriageway
Responsibility for works: Thames Water
Current status: Planned work about to start
A219 Wimbledon Bridge, Wimbledon, London, Merton
11 February — 12 February
Delays likely Lane closure
Works location: A219
Works description: Cw Trial Holes At 5 Random Locations
Responsibility for works: Merton London Borough Council
Current status: Planned work about to start

 

A219 High Street, Wimbledon, London, Merton
08 February — 16 February
Delays likely Lane closure
Works location: A219
Works description: New Gas Services- Excavate In N/Side C/Way, Close Down Inside Lane. Excavate In N/Side F/Way Maintain 1.2m For Pedestrians. D+1 Reinstatement. Tm Plan Attached For Lane Closure.
Responsibility for works: SGN
Current status: Planned work about to start
A238 Kingston Road, Raynes Park, London, Merton
08 February — 15 February
Delays likely Traffic control (two-way signals)
Works location: A238
Works description: 22/145 - Controller Change For Tfl Traffic Signals. 09:30-15:30. Footway Works Only. Pedestrian Dependant Temp Signals To Be In Use, They Will Be Placed In The Footway In Front Of The Existing Signals. Controller Change 08/02/16 - 12/02/16. Commission Site: 15/02/16.
Responsibility for works: Transport For London
Current status: Planned work about to start

February 8, 2016