Road Works Ahead in the Wimbledon Area


Traffic disruption and diversions may occur due to lane and road closures

 

Gas Main Work Causing South Wimbledon Traffic Delays For Months
Two major pipeline projects are giving grief to local drivers.

Below is a list of forthcoming roadworks in the SW19 area which are likely to cause some local delays - including Grand Drive down to one lane until December 10:

B235 Alexandra Road, Wimbledon, London, Merton

30 November — 04 December

 

 

Delays likely Traffic control (Stop/Go boards)

 

Works location: Unknown

 

 

Works description: Proposed new gully at low point in carriageway

 

 

Responsibility for works: Merton

 

 

Current status: Planned work about to start

 

 

Works reference: HC011-404691-1

 

 

Ridgway, Wimbledon, London, Merton

01 December — 02 December

 

 

Delays likely Traffic control (two-way signals)

 

Works location: Unknown

 

 

Works description: Rectify reinstatement defect in Carriageway in Carriageway. Ourintention is to complete the Permanent Reinstatement in the same phase

 

 

Responsibility for works: THAMES WATER

 

 

Current status: Planned work about to start

 

 

Works reference: MU302000030934948-001

 

 

B281 Copse Hill, West Wimbledon, London, Merton

26 November — 30 November

 

 

Delays likely Traffic control (multi-way signals)

 

Works location: Unknown

 

 

Works description: Connections Small Service:NEW SERVICE: (APPROX DEPTH 450mm-600mm):Installation of new 100amp single phase supply. Works to take place in the public footpath. Excavation to be at a depth of 450mm. 1.2m maintained for peds via a temporary walkway. Bus Stop suspension for the duration of works and suspension of single yellow on opposite side of the road.

 

 

Responsibility for works: UK POWER NETWORKS EASTERN & LONDON

 

 

Current status: Planned work about to start

 

 

Works reference: EC40010755084

 

 

Somerset Road, Wimbledon Park, London, Merton

26 November — 16 January

 

 

Delays likely Road closure

 

Works location: Unknown

 

 

Works description: WORKING ON BEHALF OF THAMES WATER: MAINS REHABILITATION

 

 

Responsibility for works: THAMES WATER

 

 

Current status: Planned work about to start

 

 

Works reference: MU823H553/MWIC04/Z012

 

 

 

B279 Grand Drive, Raynes Park
23 July — 10 December
Delays likely Lane closure
Works description: LAY 120M OF 75MM PE, 225M OF 90MM PE, 520M OF 125MM PE, 500M OF 180MM PE, ABANDON 205M OF 4" CI, 770M OF 6" CI, 485M OF 8" CI, TRANSFER 66 SERVICES, MAKE 29 MAINS CONNECTIONS AND COMPLETE ALL REINSTATEMENT
Responsibility for works: SGN
Current status: Planned work about to start
Works reference: XW053W114894639-02916

November 29, 2018