Road Works Ahead in the Wimbledon Area
Traffic disruption and diversions may occur
Gas Main Work Causing South Wimbledon Traffic Delays For Months
Two major pipeline projects are giving grief to local drivers
Below is a list of forthcoming roadworks in the SW19 area which are likely to cause some local delays - including Grand Drive down to one lane until December:
B281 Copse Hill, West Wimbledon |
7 August — 14 August |
Delays likely Traffic control (two-way signals) |
Works description: Connections Small Service:NEW SERVICE: (APPROX DEPTH 450mm-600mm):INSTALL 2 X 100 A SINGLE PHASE SUPPLY. TEMP WALKWAY REQUIRED AND 2 WAY LIGHTS TO BE SET UP. TM APPROVED BY LIAM COOPER |
Responsibility for works: UK POWER NETWORKS EASTERN & LONDON |
Current status: Planned work about to start |
Works reference: EC40010750601 |
B279 Grand Drive, Raynes Park |
23 July — 10 December |
Delays likely Lane closure |
Works description: LAY 120M OF 75MM PE, 225M OF 90MM PE, 520M OF 125MM PE, 500M OF 180MM PE, ABANDON 205M OF 4" CI, 770M OF 6" CI, 485M OF 8" CI, TRANSFER 66 SERVICES, MAKE 29 MAINS CONNECTIONS AND COMPLETE ALL REINSTATEMENT |
Responsibility for works: SGN |
Current status: Planned work about to start |
Works reference: XW053W114894639-02916 |
|
Church Hill, Wimbledon Park |
06 August — 15 September |
Delays likely Road closure |
Works description: To carry out works on speed table at the junction |
Responsibility for works: Merton |
Current status: Advanced planning |
Works reference: HC011306208 |
|
Church Hill, Wimbledon Park |
06 August — 15 September |
Delays likely Road closure |
Works description: To carry out works on speed table at the junction |
Responsibility for works: Merton |
Current status: Advanced planning |
Works reference: HC011306316 |
|
Church Hill, Wimbledon Park |
06 August — 15 September |
Delays likely Road closure |
Works description: To carry out works on speed table at the junction |
Responsibility for works: Merton |
Current status: Planned work about to start |
Works reference: HC011306360 |
|
Toynbee Road, Wimbledon Chase |
06 August — 10 August |
Delays likely Road closure |
Works description: Pigeon proofing to structure. Works start 22.00 - Works End 06.00. Road closure |
Responsibility for works: Network Rail |
Current status: Planned work about to start |
Works reference: KL137SMS2-7-73-060818 |
|