Road Works Ahead in the Wimbledon Area


Traffic disruption and diversions may occur

Below is a list of forthcoming roadworks in the SW19 area which are likely to cause some local delays:

A219 Wimbledon Bridge, Wimbledon, London, Merton
23 November — 24 November
Delays likely Traffic control (multi-way signals)
Works location: Unknown
Works description: 22/011 - 110234 - MAIN SIGNALS SWITCHED OUT, MULTIWAY TEMPS DEPLOYED TO COMPLETE LED UPGRADE TO TFL TRAFFIC SIGNALS **NO NOISY WORKS** 21:00 - 05:00, LANE CLOSURE TO ALLOW SAFE ACCESS TO CENTRE ISLAND TRAFFIC SIGNAL POLES, LANE 2 NW/B CLOSED
Responsibility for works: Transport for London
Current status: Planned work about to start
Works reference: YG515S000000001842
A219 Wimbledon Hill Road, Wimbledon, London, Merton
23 November — 24 November
Delays likely Traffic control (multi-way signals)
Works location: Unknown
Works description: 22/011 - 110234 - MAIN SIGNALS SWITCHED OUT, MULTIWAY TEMPS DEPLOYED TO COMPLETE LED UPGRADE TO TFL TRAFFIC SIGNALS **NO NOISY WORKS** 21:00 - 05:00, LANE CLOSURE TO ALLOW SAFE ACCESS TO CENTRE ISLAND TRAFFIC SIGNAL POLES, LANE 2 SE/B CLOSED
Responsibility for works: Transport for London
Current status: Planned work about to start
Works reference: YG515S000000001841
B235 Alexandra Road, Wimbledon, London, Merton
23 November — 24 November
Delays likely Traffic control (multi-way signals)
Works location: Unknown
Works description: 22/011 - 110234 - MAIN SIGNALS SWITCHED OUT, MULTIWAY TEMPS DEPLOYED TO COMPLETE LED UPGRADE TO TFL TRAFFIC SIGNALS **NO NOISY WORKS** 21:00 - 05:00, LANE CLOSURE TO ALLOW SAFE ACCESS TO CENTRE ISLAND TRAFFIC SIGNAL POLES, LANE 2 SW/B CLOSED
Responsibility for works: Transport for London
Current status: Planned work about to start
Works reference: YG515S000000001844
B235 St George's Road, London, Merton
23 November — 24 November
Delays likely Traffic control (multi-way signals)
Works location: Unknown
Works description: 22/011 - 110234 - MAIN SIGNALS SWITCHED OUT, MULTIWAY TEMPS DEPLOYED TO COMPLETE LED UPGRADE TO TFL TRAFFIC SIGNALS **NO NOISY WORKS** 21:00 - 05:00, LANE CLOSURE TO ALLOW SAFE ACCESS TO CENTRE ISLAND TRAFFIC SIGNAL POLES, LANE 2 NE/B CLOSED
Responsibility for works: Transport for London
Current status: Planned work about to start
Works reference: YG515S000000001843
A238,B279 Approach Road, Raynes Park, London, Merton
21 November — 22 November
Delays likely Traffic control (multi-way signals)
Works location: Unknown
Works description: 22/026 - 110234 - MAIN SIGNALS SWITCHED OUT, MULTIWAY TEMPS DEPLOYED TO COMPLETE LED UPGRADE **NO NOISY WORKS** 21:00 - 05:00, LANE CLOSURE TO ALLOW SAFE ACCESS TO CENTRE ISLAND TRAFFIC SIGNAL POLES. LANE 2 E/B. LANE NARROWING AROUND CENTRAL ISLAND INBETWEEN W/B LANES 1 AND 2
Responsibility for works: Transport for London
Current status: Planned work about to start
Works reference: YG515S000000001828
A238 Kingston Road, Raynes Park, London, Merton
21 November — 21 November
Delays likely Traffic control (give & take)
Works location: Unknown
Works description: CABLE PULL FROM CWAY PIT
Responsibility for works: VIRGIN MEDIA
Current status: Planned work about to start
Works reference: NK100/SSEMBU/100200225
A298 Bushey Road, Raynes Park, London, Merton
21 November — 22 November
Delays likely Traffic control (multi-way signals)
Works location: Unknown
Works description: 22/025 - 110234 - MAIN SIGNALS SWITCHED OUT, MULTIWAY TEMPS DEPLOYED TO COMPLETE LED UPGRADE TO TFL TRAFFIC SIGNALS **NO NOISY WORKS** 21:00 - 05:00, LANE CLOSURE TO ALLOW SAFE ACCESS TO CENTRE ISLAND TRAFFIC SIGNAL POLES. LANE 3 E/B AND W/B CLOSED
Responsibility for works: Transport for London
Current status: Planned work about to start
Works reference: YG515S000000001837
B286 Martin Way, Raynes Park, London, Merton
21 November — 22 November
Delays likely Traffic control (multi-way signals)
Works location: Unknown
Works description: 22/025 - 110234 - MAIN SIGNALS SWITCHED OUT, MULTIWAY TEMPS DEPLOYED TO COMPLETE LED UPGRADE TO TFL TRAFFIC SIGNALS **NO NOISY WORKS** 21:00 - 05:00, LANE CLOSURE TO ALLOW SAFE ACCESS TO CENTRE ISLAND TRAFFIC SIGNAL POLES. N/B LANE 2
Responsibility for works: Transport for London
Current status: Planned work about to start
Works reference: YG515S000000001838
B281 Copse Hill, West Wimbledon, London, Merton
20 November — 01 December
Delays likely Traffic control (two-way signals)
Works location: B281
Works description: Sewer Failure--Works Intended To Include First Time Permanent Reinstatement Within Same Phase
Responsibility for works: Thames Water
Current status: Planned work about to start

November 21, 2017