Traffic disruption and diversions may occur
Below is a list of forthcoming roadworks in the SW19 area which are likely to cause some local delays:
Ashcombe Road, Wimbledon. The bridge is closed until the end of September while it is being demolished and re-built.
| A219 Wimbledon Hill Road, Wimbledon, London, Merton | ||
| 11 September — 13 September | ||
| Delays likely Contra-flow | ||
| Works location: A219 | ||
| Works description: Replace X5 Damaged Valve Boxes | ||
| Responsibility for works: SGN | ||
| Current status: Planned work about to start | ||

September 11, 2017