Road Works Ahead in the Wimbledon Area


Traffic disruption and diversions may occur

Below is a list of forthcoming roadworks in the SW19 area which are likely to cause some local delays:

A238 Kingston Road, Wimbledon, London, Merton
23 May — 25 May
Delays likely Traffic control (multi-way signals)
Works location: A238
Works description: Main Clamp 0 To 6" Cway In Carriageway. Our Intention Is To Complete Thepermanent Reinstatement In The Same Phase
Responsibility for works: Thames Water
Current status: Planned work about to start
Ridgway, Wimbledon, London, Merton
22 May — 02 June
Delays likely Traffic control (two-way signals)
Works location: -
Works description: -
Responsibility for works: Merton London Borough Council
Current status: Planned work about to start
A238,B235 Worple Road, Raynes Park, London, Merton
19 May — 23 May
Delays likely Traffic control (give & take)
Works location: A238,B235
Works description: Clear Blockage In Carriageway & Rope Both Ways
Responsibility for works: Virgin Media
Current status: Planned work about to start
 

May 22, 2017