Road Works Ahead in the Wimbledon Area
Traffic disruption and diversions may occur
Below is a list of forthcoming roadworks in the SW19 area which are likely to cause some local delays:
Ridgway, Wimbledon, London, Merton |
22 May — 02 June |
Delays likely Traffic control (two-way signals) |
Works location: - |
Works description: - |
Responsibility for works: Merton London Borough Council |
Current status: Planned work about to start |
|
|
|
A238,B235 Worple Road, Raynes Park, London, Merton |
19 May — 23 May |
Delays likely Traffic control (give & take) |
Works location: A238,B235 |
Works description: Clear Blockage In Carriageway & Rope Both Ways |
Responsibility for works: Virgin Media |
Current status: Planned work about to start |
|
|
B235 Worple Road, Wimbledon, London, Merton |
20 May — 22 May |
Delays likely Traffic control (two-way signals) |
Works location: B235 |
Works description: Sluice Valve Box Replace Within Carriageway Only In Carriageway. Ourintention Is To Complete The Permanent Reinstatement In The Same Phase |
Responsibility for works: Thames Water |
Current status: Planned work about to start |
|
May 21, 2017
|