Road Works Ahead in the Wimbledon Area


Traffic disruption and diversions may occur

Below is a list of forthcoming roadworks in the SW19 area which are likely to cause some local delays:

A238,B235 Worple Road, Raynes Park, London, Merton
19 May — 23 May
Delays likely Traffic control (give & take)
Works location: A238,B235
Works description: Clear Blockage In Carriageway & Rope Both Ways
Responsibility for works: Virgin Media
Current status: Planned work about to start
B235 Worple Road, Wimbledon, London, Merton
20 May — 22 May
Delays likely Traffic control (two-way signals)
Works location: B235
Works description: Sluice Valve Box Replace Within Carriageway Only In Carriageway. Ourintention Is To Complete The Permanent Reinstatement In The Same Phase
Responsibility for works: Thames Water
Current status: Planned work about to start
A238 Kingston Road, Raynes Park, London, Merton
15 May — 19 May
Delays likely Traffic control (two-way signals)
Works location: A238
Works description: Lay New Gas Mains And Services To 424-426 - Excavate In The Nearside Carriageway Using 2 Way Lights, Pedestrian Light Switch Out Required, And Bus Stop Suspension, Excavate In The Nearside Footway Maintaining 1m For Pedestrians - D+1 Reinstatement
Responsibility for works: SGN
Current status: Planned work about to start

May 19, 2017