Road Works Ahead in the Wimbledon Area
Traffic disruption and diversions may occur
Below is a list of forthcoming roadworks in the SW19 area which are likely to cause some local delays:
A238,B235 Worple Road, Raynes Park, London, Merton |
19 May — 23 May |
Delays likely Traffic control (give & take) |
Works location: A238,B235 |
Works description: Clear Blockage In Carriageway & Rope Both Ways |
Responsibility for works: Virgin Media |
Current status: Planned work about to start |
|
|
B235 Worple Road, Wimbledon, London, Merton |
20 May — 22 May |
Delays likely Traffic control (two-way signals) |
Works location: B235 |
Works description: Sluice Valve Box Replace Within Carriageway Only In Carriageway. Ourintention Is To Complete The Permanent Reinstatement In The Same Phase |
Responsibility for works: Thames Water |
Current status: Planned work about to start |
|
A238 Kingston Road, Raynes Park, London, Merton |
15 May — 19 May |
Delays likely Traffic control (two-way signals) |
Works location: A238 |
Works description: Lay New Gas Mains And Services To 424-426 - Excavate In The Nearside Carriageway Using 2 Way Lights, Pedestrian Light Switch Out Required, And Bus Stop Suspension, Excavate In The Nearside Footway Maintaining 1m For Pedestrians - D+1 Reinstatement |
Responsibility for works: SGN |
Current status: Planned work about to start |
|
![](/image/wimbledonsw19/info/images/roadworks1.jpg)
May 19, 2017
|