Road Works Ahead in the Wimbledon Area
Traffic disruption and diversions may occur
Below is a list of forthcoming roadworks in the SW19 area which are likely to cause some local delays:
A219 Gladstone Road, Wimbledon, London, Merton |
13 June — 01 July |
Delays likely Road closure (see picture below) |
Works location: A219 |
Works description: Sewer Failure--Works Intended To Include First Time Permanent Reinstatement Within Same Phase |
Responsibility for works: Thames Water |
Current status: Planned work about to start |
![](/image/wimbledonsw19/info/images/img_20160614_1255098.jpg)
A219 Hartfield Road |
10 June — 15 June |
|
|
Delays likely Traffic control (priority working) |
|
Works location: A219 |
|
|
Works description: New Water Connection 1x2 Port Mtrd Manifold Off 4" Ci Main Excavating 7mcarriageway And 3m In Footway. Our Intention Is To Complete Thepermanent Reinstatement In The Same Phase |
|
|
Responsibility for works: Thames Water |
|
|
Current status: Planned work about to start |
|
|
|
|
A219 Wimbledon Hill Road, Wimbledon |
09 June — 13 June |
|
|
Delays likely Lane closure |
|
Works location: A219 |
|
|
Works description: S81 Emergency Cover Replacemen--Works Intended To Include First Time Permanent Reinstatement Within Same Phase |
|
|
Responsibility for works: Thames Water |
|
|
Current status: Planned work about to start |
|
|
|
A219 Parkside, Wimbledon, London, Merton |
13 June — 14 June |
Delays likely Traffic control (two-way signals) |
Works location: A219 |
Works description: Cw Resurfacing Approc 100m |
Responsibility for works: Merton London Borough Council |
Current status: Planned work about to start |
June 12, 2016
|