Traffic disruption and diversions may occur
Below is a list of forthcoming roadworks in the SW19 area which are likely to cause some delays:
A219 Hartfield Road, London, Merton | ||
25 August — 28 August Traffic control (two-way signals) | ||
Delays likely due to Streetworks New Water Connection 1x32mm B/P Mtrd Supply Off Of 3" Ci Main Excavating3m Footway And 7m In Carriageway. Our Intention Is To Complete Thepermanent Reinstatement In The Same Phase at A219 |
||
Responsibility: Thames Water | ||
EToN status: Planned work about to start |
August 24, 2015