Road Works Ahead in the Wimbledon Area


Traffic disruption and diversions may occur

Below is a list of forthcoming roadworks in the SW19 area which are likely to cause some local delays.

B235 Worple Road, Wimbledon, London, Merton
27 April — 27 April
Delays likely Traffic control (two-way signals)
Works location: B235
Works description: S81 Planned Cover Replacement--Works Intended To Include First Time Permanent Reinstatement Within Same Phase
Responsibility for works: Thames Water

Current status: Planned work about to start

 

B235 Worple Road, Wimbledon, London, Merton
27 April — 29 April
Delays likely Lane closure
Works location: B235
Works description: Replace 1 Jointbox Frame And Cover(S) (725mm X 225mm) In Footway
Responsibility for works: BT
Current status: Planned work about to start

April 26, 2015