Road Works Ahead in the Wimbledon Area


Traffic disruption and diversions may occur

Below is a list of forthcoming roadworks in the SW19 area which are likely to cause some local delays.

Thornton Road, Wimbledon, London, Merton
16 February — 19 February
Delays likely Road closure
Works location: -
Works description: -
Responsibility for works: Thames Water
Current status: Planned work about to start

A238 Kingston Road, Raynes Park, London, Merton
16 February — 18 February
Delays possible Some carriageway incursion
Works location: A238
Works description: New Water Connection 1x25mm Mdpe Mtrd Supply Off 7" Ci Main. 2m Infootway. Our Intention Is To Complete The Permanent Reinstatement In Thesame Phase
Responsibility for works: Thames Water
Current status: Planned work about to start

B235 Worple Road, Wimbledon, London, Merton
16 February — 17 February
Delays possible Some carriageway incursion
Works location: B235
Works description: Network Operations Faults:Lv Mains Fault:Interim To Permanent Reinstatement
Responsibility for works: UK Power Networks
Current status: Planned work about to start

B235 Worple Road, Wimbledon, London, Merton
17 February — 19 February
Delays possible Some carriageway incursion
Works location: B235
Works description: Lay 8m Of Duct In Footway
Responsibility for works: Virgin Media
Current status: Planned work about to start

B279 Grand Drive, Raynes Park, London, Merton
17 February — 18 February
Delays possible Some carriageway incursion
Works location: B279
Works description: Clear Blockage In The Footway
Responsibility for works: Virgin Media
Current status: Planned work about to start

February 16, 2015