Road Works Ahead in the Wimbledon Area
Traffic disruption and diversions may occur
Below is a list of forthcoming roadworks in the SW19 area which are likely to cause some local delays:
A219 The Broadway, London, Merton |
14 August — 25 August |
Delays likely Traffic control (two-way signals) |
Works location: A219 |
Works description: Sewer Failure--Works Intended To Include First Time Permanent Reinstatement Within Same Phase |
Responsibility for works: Thames Water |
Current status: Planned work about to start |
Southey Road, Wimbledon, London, Merton |
14 August — 25 August |
Delays likely Road closure |
Works location: - |
Works description: - |
Responsibility for works: Thames Water |
Current status: Planned work about to start |
|
|
Southside Common, Wimbledon, London, Merton |
14 August — 15 August |
Delays likely Road closure |
Works location: - |
Works description: - |
Responsibility for works: Merton London Borough Council |
Current status: Advanced planning |
|
Ridgway, Wimbledon, London, Merton |
11 August — 14 August |
Delays likely Traffic control (two-way signals) |
Works location: - |
Works description: - |
Responsibility for works: Thames Water |
Current status: Planned work about to start |
A219 High Street, Wimbledon, London, Merton |
08 August — 14 August |
Delays likely Traffic control (two-way signals) |
Works location: A219 |
Works description: Disconnect Existing Supply Approx 1.5m Sq In Carriageway And Lay New Service 1.76m In Carriageway And 3.25m In Footway |
Responsibility for works: Fulcrum Pipelines Limited |
Current status: Planned work about to start |
A298 Bushey Road, Raynes Park, London, Merton |
07 August — 16 August |
Delays likely Traffic control (multi-way signals) |
Works location: A298 |
Works description: Dslam Street Cabinet & Power Installation. Excavate To Lay Bt Ducts, Lay Concrete Plinth, Stand Cab. Excavate To Expose Low Voltage Cable For Power Connection And Lay Duct. Power Engineer To Carry Out Inspection Prior To Jointing. Power Jointing Team To Insert Cable And Execute Jointing Works. Reinstate, Check And Clear Site. |
Responsibility for works: BT |
Current status: Planned work about to start |
B279 Grand Drive, Raynes Park, London, Merton |
07 August — 16 August |
Delays likely Traffic control (multi-way signals) |
Works location: B279 |
Works description: Dslam Street Cabinet & Power Installation. Excavate To Lay Bt Ducts, Lay Concrete Plinth, Stand Cab. Excavate To Expose Low Voltage Cable For Power Connection And Lay Duct. Power Engineer To Carry Out Inspection Prior To Jointing. Power Jointing Team To Insert Cable And Execute Jointing Works. Reinstate, Check And Clear Site. |
Responsibility for works: BT |
Current status: Planned work about to start |
![](/image/wimbledonsw19/info/images/roadworks1.jpg)
August 14, 2017
|