Road Works Ahead in the Wimbledon Area


Traffic disruption and diversions may occur

Below is a list of forthcoming roadworks in the SW19 area which are likely to cause some local delays.

A238/A24 High Street Collier's Wood, Colliers Wood, London, Merton
12 May — 15 May
Delays likely Traffic control (two-way signals)
Works location: A238/A24
Works description: Chamber Adjust Lrg Frame& Cover Cway In Carriageway. Ourintention Is To Complete The Permanent Reinstatement In The Same Phase
Responsibility for works: Thames Water
Current status: Planned work about to start

A238/A24 High Street Collier's Wood, Colliers Wood, London, Merton
12 May — 15 May
Delays likely Traffic control (two-way signals)
Works location: A238/A24
Works description: Chamber Adjust Lrg Frame& Cover Cway In Carriageway. Ourintention Is To Complete The Permanent Reinstatement In The Same Phase
Responsibility for works: Thames Water
Current status: Planned work about to start

A3 Beverley Way, West Wimbledon, London, Merton
12 May — 17 May
Delays likely Lane closure
Works location: Southbound, From Beverey Way (Kingston) Heading South To Shannon Corner Junction
Works description: Tarmac Patches And Barrier Repairs Lane 1 And 2 With Switches To 2 And 3 Where Required
Responsibility for works: Transport For London
Current status: Planned work about to start

A218 Haydon'S Road, South Wimbledon, London, Merton
12 May — 16 May
Delays possible
Works location: A218
Works description: Connections Small Service:Service Upgrade: (Approx Depth 450mm):Excavate And Expose Mains Cable For The Installation Of 100amp Service And Removal Of An Existing Supply.
Responsibility for works: UK Power Networks
Current status: Planned work about to start

A219 Merton Road, South Wimbledon, London, Merton
13 May — 15 May
Delays possible
Works location: A219
Works description: Service Pipe Repair In The Fway In Footway. Our Intention Is To Completethe Permanent Reinstatement In The Same Phase
Responsibility for works: Thames Water
Current status: Planned work about to start

A219 Wimbledon Hill Road, Wimbledon, London, Merton
13 May — 16 May
Delays possible
Works location: A219
Works description: Connections Highway Services:Disconnection: (Approx Depth 450mm):Disconnection Of Electrical Supply To A Bus Shelter
Responsibility for works: UK Power Networks
Current status: Planned work about to start

A219 Wimbledon Park Side, Southfields, London, Wandsworth
13 May — 13 May
Delays possible
Works location: A219
Works description: Remedial Works To Be Carried Out - Replace Buff Anti Skid - Pedestrian Crossing Closed
Responsibility for works: Southern Gas Networks Plc
Current status: Planned work about to start

A238 Kingston Road, Wimbledon, London, Merton
13 May — 15 May
Delays possible
Works location: A238
Works description: Service Pipe Repair In The Fway And Cway In Carriageway. Our Intention is To Complete The Permanent Reinstatement In The Same Phase
Responsibility for works: Thames Water
Current status: Planned work about to start

May 12, 2014