Road Works Ahead in the Wimbledon Area
Traffic disruption and diversions may occur
Below is a list of forthcoming roadworks in the SW19 area which are likely to cause some local delays:
Whatley Avenue, Wimbledon Chase, London, Merton |
09 January — 10 January |
Delays likely Road closure |
Works location: Bridge (Rail Over Road) Whatley Avenue Sms2 5... |
Works description: Detailed Examination Of Rail Over Road Bridge. Between The Hours 22:00 - 06:00hrs ... |
Responsibility for works: Network Rail Infrastructure Ltd |
Current status: Advanced planning |
|
|
Wimbledon Hill Road, Wimbledon, London, Merton |
10 January — 12 January |
Delays likely Traffic control (priority working) |
Works location: - |
Works description: - |
Responsibility for works: Thames Water |
Current status: Planned work about to start |
|
High Street, Wimbledon, London, Merton |
03 January — 16 January |
Delays likely Traffic control (Stop/Go boards) |
Works location: - |
Works description: - |
Responsibility for works: UK Power Networks |
Current status: Planned work about to start |
|
|
High Street, Wimbledon, London, Merton |
03 January — 16 January |
Delays likely Traffic control (Stop/Go boards) |
Works location: - |
Works description: - |
Responsibility for works: UK Power Networks |
Current status: Planned work about to start |
|
|
|
January 9, 2017
|