Traffic disruption and diversions may occur due to lane and road closures
Below is a list of forthcoming roadworks in the SW19 area which are likely to cause some local delays:
21 February — 25 February |
|
|
Delays likely Traffic control (give & take) |
|
|
Works location: Unknown |
|
|
Works description: Excavate to clear blockage in carrigaeway |
|
|
Responsibility for works: VIRGIN MEDIA |
|
|
Current status: Planned work about to start |
|
|
Works reference: NK100/SSEMBU/100269176 |
|
|
21 February — 25 February |
|
|
Delays likely Traffic control (give & take) |
|
|
Works location: Unknown |
|
|
Works description: Excavate to clear blockage in carrigaeway |
|
|
Responsibility for works: VIRGIN MEDIA |
|
|
Current status: Planned work about to start |
|
|
Works reference: NK100/SSEMBU/100269174 |
|
|
22 February — 26 February |
|
|
Delays likely Traffic control (Stop/Go boards) |
|
|
Works location: Unknown |
|
|
Works description: RVS 28day supply new unit to replace damaged/rocking gully grid & frame. |
|
|
Responsibility for works: Merton |
|
|
Current status: Planned work about to start |
|
|
Works reference: HC011-425089-1A |
|
|
20 February — 22 February |
|
|
Delays likely Traffic control (two-way signals) |
|
|
Works location: Unknown |
|
|
Works description: Washout Adjust Cway in Carriageway. Our intention is to complete thePermanent Reinstatement in the same phase |
|
|
Responsibility for works: THAMES WATER |
|
|
Current status: Planned work about to start |
|
|
Works reference: MU302000031201451-001 |
|
|
11 February — 01 March |
|
|
Delays likely Lane closure |
|
|
Works location: Unknown |
|
|
Works description: Buildout footway and construct cycle track Construct entry tab |
|
|
Responsibility for works: Merton |
|
|
Current status: Planned work about to start |
|
|
Works reference: HC011348236 |
|
|
February 20, 2019