Road Works Ahead in the Wimbledon Area


Traffic disruption and diversions may occur

Below is a list of forthcoming roadworks in the SW19 area which are likely to cause some local delays:

A298 Bushey Road, Raynes Park, London, Merton
24 November — 25 November
Delays likely Traffic control (multi-way signals)
Works location: Unknown
Works description: 22/009 - 110234 - MAIN SIGNALS SWITCHED OUT, MULTIWAY TEMPS DEPLOYED TO COMPLETE LED UPGRADE TO TFL TRAFFIC SIGNALS **NO NOISY WORKS** 21:00 - 05:00, LANE CLOSURE TO ALLOW SAFE ACCESS TO CENTRE ISLAND TRAFFIC SIGNAL POLES, LANE 3 E/B AND LANE 2 W/B CLOSED
Responsibility for works: Transport for London
Current status: Planned work about to start
Works reference: YG515S000000001839
B281 Copse Hill, West Wimbledon, London, Merton
20 November — 01 December
Delays likely Traffic control (two-way signals)
Works location: B281
Works description: Sewer Failure--Works Intended To Include First Time Permanent Reinstatement Within Same Phase
Responsibility for works: Thames Water
Current status: Planned work about to start
B235 Worple Road, Wimbledon, London, Merton
25 November — 26 November
Delays likely Traffic control (multi-way signals)
Works location: B235
Works description: To build 2 vehicle crossovers
Responsibility for works: Merton
Current status: Planned work about to start
Works reference: HC011-283790-1
Ridgway, Wimbledon, London, Merton
25 November — 25 November
Delays likely Traffic control (two-way signals)
Works location: Unknown
Works description: Rectifiy reinstatement defect in Carriageway in Carriageway. Ourintention is to complete the Permanent Reinstatement in the same phase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU302000030858870-001
B282 West Barnes Lane, London, Merton
26 November — 27 November
Delays likely Traffic control (two-way signals)
Works location: Bridge (Rail over Road) Named WEST BARNES LANE BML1 2/33...
Works description: Steel works repairs working from 01.00 26-11-17 to 27-1-17 04.00...
Responsibility for works: Network Rail
Current status: Advanced planning
Works reference: KL137BML1-08-69-261117

November 24, 2017