Road Works Ahead in the Wimbledon Area
Traffic disruption and diversions may occur
Below is a list of forthcoming roadworks in the SW19 area which are likely to cause some local delays:
B281 Copse Hill, West Wimbledon, London, Merton |
21 October — 21 October |
Delays likely Traffic control (Stop/Go boards) |
Works location: B281 |
Works description: Rvs 28day Supply Envirograte To Replace Damaged Gully Grid. |
Responsibility for works: Merton London Borough Council |
Current status: Planned work about to start |
|
|
Ridgway, Wimbledon, London, Merton |
21 October — 25 October |
Delays likely Traffic control (two-way signals) |
Works location: - |
Works description: - |
Responsibility for works: Thames Water |
Current status: Planned work about to start |
|
A219 Hartfield Road, London, Merton |
19 October — 24 October |
Delays likely Traffic control (give & take) |
Works location: A219 |
Works description: New Water Connection 1x4 Port Mdpe Mtrd Manifold And 3x32mm Mdpe Mtrd Supplies Off Of 3" Ci Main Excavating 1m In Footway. Our Intention Isto Complete The Permanent Reinstatement In The Same Phase |
Responsibility for works: Thames Water |
Current status: Planned work about to start |

October 20, 2017
|