Road Works Ahead in the Wimbledon Area
Traffic disruption and diversions may occur
Below is a list of forthcoming roadworks in the SW19 area which are likely to cause some delays:
| A238 Kingston Road, Raynes Park, London, Merton |
| 03 August — 07 August Traffic control (priority working) |
Delays likely due to Streetworks
Lay New Service To Flat @ 490, Excavate Nearside Carriageway Under Using Priority, Excavate Nearside Footway Maintaining 1m For Pedestrians Using Footway Boards. Suspend Bus Stop 19096 at A238 |
| Responsibility: SGN |
EToN status: Planned work about to start
|
|
|
| A238 Kingston Road, Raynes Park, London, Merton |
| 03 August — 07 August Traffic control (priority working) |
Delays likely due to Streetworks
New Connection To Flat 494. Excavate In N/Side F/Way Maintain 1.2 Metres For Pedestrians. Excavate In N/Side C/Way Maintain 3.5 Metres Using Priority Working. Cyclist Dismount And Use Footway Signs Will Be Used at A238 |
| Responsibility: SGN |
EToN status: Planned work about to start
|
|
|
| B279 Grand Drive, Raynes Park, London, Merton |
| 03 August — 21 August Lane closure |
Delays likely due to Streetworks
Lay 165m X 90mm Pe Lp Main,Make 2 Mains Connections, Relay 20 Services. Complete Reinstatement at B279 |
| Responsibility: SGN |
EToN status: Planned work about to start
|
|
|
| A219 Wimbledon Bridge, Wimbledon, London, Merton |
| 03 August — 05 August Some carriageway incursion |
Delays possible due to Streetworks
Permanent Reinstatement In Carriageway - Antiskid. at A219 |
| Responsibility: Thames Water |
EToN status: Planned work about to start
|
|
|
| A238 Kingston Road, Raynes Park, London, Merton |
| 03 August — 07 August Some carriageway incursion |
Delays possible due to Streetworks
Build 2 Concrete Chamber 915mm X 445mm X 965mm Deep In Footway,Demolish 1 Existing Jointbox(S) Or Cabinet Base(S),Install 11m Of 1 Way Poly Duct In Carriageway,Install 26m Of 1 Way Poly Duct In Footway at A238 |
| Responsibility: BT |
EToN status: Planned work about to start
|
|
August 2, 2015
|